A.S.P.I. provided complete construction surveying for the all utilities and site paving required by the district to prepare the site for the future construction of new school facilities. A.S.P.I provided the horizontal and vertical construction control for the new Geothermal Wells installed for the future heating and cooling of the new school facilities being constructed at this location. A detailed as-built topographic survey was completed and provided to the District for the design of the final project phasing.